Sidney & Lois Eskenazi Hospital: Project Breakdown
Project source list:
Completion date: December 2013
Owner: Health and Hospital Corp. of Marion County, parent company of Eskenazi Health
Total building area: 882,346 SF (hospital); 198,435 SF (ambulatory care building); 12,600 SF (central utility plant); 23,300 SF (central boiler plant); 300,000 SF (faculty office building)
Total construction cost: $593 million
Architecture: HOK (executive architect), Ratio, BSA LifeStructures, Blackburn Associates, A2S04, Synthesis, DSR
Interior design: HOK, Maregatti Interiors
Engineering: Syska Hennessy Group, BSA LifeStructures, Ross & Baruzzini, , L’Acquis, American Structurepoint, FRP
Landscape architecture/civil engineering: Context, Olin, Ratio, Land Collective, HOK, BCCLT, 9Bark, VS Engineering
Specialty consultants: CCI, RLR, Lerch Bates, Circle Design, Sherman Robinson, HOK, Moss, Shrewsberry, SMW, Greg Fehribach, Blackburn Associates, Platinum Earth
Contracting: Jacobs
Construction: Jacobs
AV equipment/electronics/software: Ciena, Avaya
Carpet/flooring: Mohawk Carpets, Mannington Sheet Vinyl
Ceiling/wall systems: USG
Doors/locks/hardware: Atlas
Fabric/textiles: Maharam, Carnegie, Designtex
Furniture – seating/casegoods: Steelcase, Knoll, Herman Miller
Lighting: Focal Point
Signage/wayfinding: ASI Indianapolis and Harmon Signs
Surfaces – solid/other: Corian, Wilsonart
To read more about the project, see “Eskenazi Health Embraces Its Civic Duty” or check out Healthcare Design‘s November 2014 issue.