Camp Pendleton Replacement Hospital: Project Breakdown
Completion date: October 17, 2013
Owner: NAVFAC – Southwest
Architecture: HDR Architecture and HKS Inc.
Interior design: HKS Inc., HDR Architecture, and Young + Co. Inc.
Contracting: Clark/McCarthy, A Joint Venture
Engineering: KPFF Consulting Engineers (structural engineer); TMAD Taylor and Gaines (mechanical engineer); Exp (electrical engineer), Berger-ABAM/Flores Lund Consultants (civil engineer); DeLorenzo International (landscape); Murray Company (plumbing engineer); Aero (fire sprinkler); Rolf-Jensen (fire-life safety)
Construction: Clark/McCarthy, A Joint Venture
Total building area: 500,000 sq. ft. (hospital building), 1 million sq. ft. (entire campus)
Total construction cost: $447 million
Cost/sq. ft.: $447
Suppliers/fabricators:
Art/pictures: Brad Howe, Cherrie La Porte, Linda Raynsford, Roundtree
AV equipment/electronics/software: Creston, Valcom, Hill-Rom, Aiphone, Cornell, UTC Security, Axis Communications, Lenel, Stentofon, Amp
Carpet/flooring: Bentley (Interface)
Ceiling/wall systems: Armstrong, DIRTT
Doors/locks/hardware: Eggers (wood doors), Door Components (metal doors), Ingersoll Rand (hardware/locks)
Furniture (seating/casegoods): Steelcase, Herman Miller, Knoll, Haworth
Handrails/wall guards: J.L. Industries
Headwalls/booms: Hill-Rom
Lighting: Scott Architectural, 3Form, Daybrite, Phoenix, Omega, Spectrum, LA Lighting, Ledalite, Nite Brite, Phillips
Signage/wayfinding: CA Signs
Surfaces (solid): Dupont, LG
Wallcoverings: Frazee, J.L. Industries
To read more about the project, see “Camp Pendleton Replacement Hospital Mirrors Military Traditions” or check out Healthcare Design's April issue.