Is Transition Planning the Same as Move Management?

Oftentimes, I hear healthcare professionals confused over the differences between transition planning and move management.

Transition planning services are frequently associated with move management, and although both are typically applied during the construction phase of a project, the services are uniquely different with distinct deliverables.

You're Right–So Get to Know People!

On a recent flight from St Louis to Orlando, I sat behind two recent college grads grumbling about the economy and their apparent lack of job prospects.  

The data is ugly—more than 50% of college grads are unable to find work and 85% are moving back home after graduation. Who’s to blame these kids for their bad attitude, all they have known since they walked on campus in the fall of 2008 has been recession and doom and gloom. 

Social Media for Architects

Unless you've been living under a rock — or don't own a computer — chances are that you're aware of the Social Media revolution. Social Media is absolutely changing the way we communicate, and savvy businesspeople around the world have taken advantage of the medium to reach out to their potential audiences as they have never before.

HCAHPS and the Relationship to the Built Environment

I love to ask CEOs the question, “What keeps you up at night?” The answer used to be “access to capital.” But in today’s healthcare reform environment, the answer I most commonly receive is “my hospital’s HCAHPS scores.” 

So if the C-Suite is concerned about HCAHPS scores, then healthcare planners and designers need to be concerned about HCAHPS scores as well.

Capital Health Medical Center – Hopewell – Hopewell, NJ

Project category: New construction (completed November 2011)

Chief Administrator: Larry DiSanto, COO, Executive Vice President and Chief Operations Officer, (609) 394-4254

Firm: HKS, Inc., (214) 969-5599; Array Healthcare Facilities Solutions, (610) 270-0599; Anchor Health Properties, (302) 655-1010

Riverside Medical Center, East Building – Kankakee, IL

Project category: New construction & Remodel/Renovation (completed December 2011)

Firms: Jensen and Halstead Ltd., (312) 664-7557

Design team: David Dastur, AIA, Architect, Principal; Gleen Seerup, AIA, Principal; Martha A. Strong, Director of Interior Design (Jensen and Halstead Ltd.); Dave Bodenschatz, Principal-in-Charge, MEP Engineer (KJWW Engineering Consultants); Brian P Hornickel, Structural Engineer (Abatangelo – Hason, Ltd.)

Photography: ©2011 Bruce Van Inwegen

Ciudad Hospitalaria Panama – Clayton, Panama

Project category: Unbuilt/Conceptual Design Only (July 2014)

Firm: HKS Inc., (214) 969-5599

Design team: Eduardo Egea, AIA, Managing Principal; Jason Schroer, AIA, LEED AP, Design Principal; Rupert H Brown, AIA, Senior Project Designer; Tina Duncan, AIA, Senior Healthcare Planner Dulce Torres, RA, Int. Assoc. AIA, LEED AP, Senior Healthcare Planner; Brian Ahmes, Project Designer

Total building area (sq. ft.): 2,469,566

Construction cost/sq. ft.: $263

Total construction cost (excluding land): $650,000,000

University of Arkansas Epley Center for Health Professions – Fayetteville, AR

Project category: New construction & Remodel/Renovation (completed December 2011)

Firms: James R. Childers Architect, Inc., (479) 783-2480; SmithGroupJJR, (602) 265-2200

Design team: Architect of Record (James R. Childers Architect, Inc.); Consulting Architect (SmithGroupJJR); Civil Engineering (Cardinal Engineering, Inc); Structural Engineering (Foy Consulting & Engineering, LLC); MEP Engineer (SSR, Inc.); Landscape Architect (Gray Rock Consulting, Inc.)

Total building area (sq. ft.): 26,203 (new); 19,132 (renovation)

CS Mott Children's Hospital and Von Voigtlander Women's Hospital – Ann Arbor, MI

Project category: New construction (completed June 2011)

Chief administrator: Loree Collette, Clinical Nurse Lead, (734) 936-6262

Firm: HKS, (214) 969-5599

Design Team: John Bienko, Project Manager; Ron Dennis, Principal in Charge; Doug Compton, Design Architect; Rachel Saucier, Architectural Planner; Penny Wright, Contract Administration; Iris Dates, Interior Designer

Photography: Blake Marvin

Total building area (sq. ft.): 1,100,000

Strategy & Planning Series
Strategy & Planning Series
Strategy & Planning Series
Strategy & Planning Series
Strategy & Planning Series
Strategy & Planning Series
Strategy & Planning Series
Strategy & Planning Series
Strategy & Planning Series
Strategy & Planning Series
Strategy & Planning Series