Riley Hospital for Children at IU Health Maternity Tower
Posted on March 7, 2022 ·

©2021 Caleb Tkach, AIAP
BSA designers were tasked with keeping electrical equipment operational. Tight spaces in which to locate and add necessary systems and equipment added complexity to the project, as did the use of temporary electrical panels to transfer loads to the new electrical switchgear.
Posted in:
Featured Firms Projects
Tagged with: