HCD Magazine
HCD Forum 2025 Recap: Colorado Springs, Colorado
Featured
Latest Posts
Emory Crawford Long Hospital ATLANTA, GA
Project category: New construction (completed December 2002) Chief administrator: Al Blackwelder, Chief Executive Officer, (404) 686-2450 Firms: HKS, Inc., (214) 969-5599; Pickard Chilton, (203) 786-8600 Design team: Dan Noble, FAIA,…
August 31St. John West Shore Hospital WESTLAKE, OH
The St. John West Shore Hospital is located within a growing suburb. The existing 5,400-square-foot Emergency Department was replaced by a new, 13,600-square-foot Emergency Department with 4 trauma beds, 4…
August 31The Queen's Medical Center HONOLULU, HI
Project category: Remodel/Renovation (completed November 2004) Chief administrator: Arthur Ushijima, President and CEO, (808) 547-4688 Firm: Pacific Asia Design Group, Inc., (808) 595-6600 Design team: Ann N. Matsunami, AIA, Principal;…
August 31