HCD Magazine
Deadline Extended For Healthcare Design’s 2026 A/E/C Survey To Feb. 6
The new deadline for U.S.-based healthcare architecture, engineering, and construction firms to participate in the biennial survey is Friday, Feb. 6.
Featured
Latest Posts
Zion Regional Medical Center Planned In Utah
The 85,000-square-foot facility will include four ORs and 12 emergency bays.
News January 3PHOTO TOUR: South Jordan VA Clinic
The 30,000-square-foot facility expands access to care for veteran residents in Utah with a design that aligns with the VA’s collaborative care model.
Projects January 3Cause And Effect
The ongoing COVID-19 pandemic has influenced healthcare project work in numerous ways, but respondents to Healthcare Design’s 2021 COVID-19 Industry Survey are optimistic about what’s ahead.
Trends December 29















