MetroHealth Adds Helipad To Critical Care Pavilion In Cleveland
The structure features technologies to remove ice and snow removal as well as control noise and vibration.
News December 13The structure features technologies to remove ice and snow removal as well as control noise and vibration.
News December 13The expansion project will include a five-story, 150,000-square-foot patient tower.
News December 13Walter B. Jones Jr., an architect who led several transformative healthcare design projects, most recently at The MetroHealth…
News December 13A new concept paper highlights ongoing steps HHS plans to take to improve cyber resiliency and protect patient…
News December 12The latest report from ABC notes construction sector job openings decreased by 4,000 in October, up 25,000 from…
News December 12The 7,500-square-foot outpatient facility includes 15 exam rooms.
News December 11Insufficient reimbursement rates and operating losses are attributed to the closing of New England Sinai Acute Long-Term Care…
News December 8The HCA Florida Palmetto Emergency facility is expected to open in summer 2024.
News December 8The firm opened a firm that includes architecture and engineering services.
News December 7